ANP Marine & Industrial

Refrigerant Conversion Questionnaire

Chief Engineer On-Site Report — Photos Required

Emergency Line
+44 151 440 3843
24/7 Engineering Response

Meet ICE & CIRA — Your AI Engineering Assistants

Available 24/7 to support this questionnaire and any engineering or commercial enquiry

ICE

ICE

Intelligent Cooling Expert
Online — Technical

Senior marine refrigeration engineer with 30+ years of field experience. ICE handles all technical questions — refrigerant conversions, system diagnostics, F-Gas compliance, compressor troubleshooting and installation guidance.

Refrigerant Conversion Fault Diagnosis F-Gas Compliance
CIRA

CIRA

Cooling Intelligent Response Assistant
Online — Commercial

Former refrigeration chief engineer, now your dedicated commercial support specialist. CIRA handles spare parts, pricing, stock availability, delivery logistics, order tracking and all commercial enquiries.

Spare Parts Pricing & RFQ Worldwide Delivery

Use the chat assistant (bottom right) to speak with ICE or CIRA at any point during this questionnaire. Type "ICE" for technical guidance or "CIRA" for parts and commercial support. Both are available 24/7.

Step 1 of 7 14%

System & Vessel Details

Basic identification information for the vessel and refrigeration system.

Current Refrigerant & Conversion Target

Identify the existing refrigerant and the proposed conversion refrigerant.

Compressor Details

Record make, model and current condition of the compressor(s).

System Condition Assessment

Current operating parameters and component condition ratings.

A Current Operating Pressures

B Component Condition Ratings

Condenser
Evaporator
Filter Drier
Expansion Valve (TEV)
Sight Glass
Seals / Gaskets

C Known Issues

Photo Documentation

Upload photos of the system to support the conversion assessment. Clear, labelled photos significantly improve accuracy of our engineering recommendation.

Required photos: compressor nameplate, system overview, condenser, evaporator, expansion valve, filter drier, and any visible defects. Each file should be under 10MB. JPEG or PNG preferred.

Click to upload

or drag & drop

Click to upload

or drag & drop

Click to upload

or drag & drop

Click to upload

or drag & drop

Click to upload multiple

Up to 5 additional images

Regulatory & Compliance

F-Gas, class and flag state compliance requirements for this conversion.

Review & Submit

Review your submission and confirm contact details for the engineering report.

Submission Summary

Complete the previous steps to see your summary here.

Reviewed by a qualified marine engineer. Every submission is assessed by our technical engineering team before a conversion recommendation is issued. You will receive a detailed report with refrigerant recommendation, component requirements, oil change specification and compliance notes.